China Lesso was honored to participate in the construction of Utility Tunnel Constructions of Xiong'an New Area, and supply piping systems including HDPE enhanced spiral structured-wall pipes (B-type), corrugated pipe, plastic-steel mesh skeleton-plastic (PE), plastic inspection well, ensuring a high quality piping network.