The earliest, most mature, and completed utility tunnel system was built underground in Hengqin New Area of Zhuhai City that is 33.4 kilometers in length with 6 types of pipes and a single type of cable.
LESSO played a significant supporting role in the construction process, with the main products entering the utility tunnel consisting of LESSO’s communication ducts.
● Product Supplied:
Telecommunications Duct
● Country: China
Country:China
Products: Plastic Pipes and Fittings
Country:China
Products: Plastic Pipes and Fittings
Country:China
Products: HDPE double-wall corrugated pipes and fittings, Plastic inspection wells
Country:China
Products: PE water supply pipes, PVC water supply pipes, PVC drainage pipes, hot dip galvanized steel pipes, metal conduit
Country:China
Products: HDPE enhanced spiral structured-wall pipes (B-type), corrugated pipe, plastic-steel mesh skeleton-plastic (PE), plastic inspection well
Country:China
Products: PVC drainage pipes, plastic-steel mesh skeleton-plastic (PE) composite pipes, HDPE spiral enhanced pipes and plastic inspection wells.
TOP